Path direction

Non standardized estimate

Standardized error

Value of T

Standardized estimate

Calm—control point

0.130

0.026

4.946***

0.154

Hope—control point

0.246

0.026

9.555***

0.303

Optimism—control point

0.134

0.025

5.471***

0.177

Confidence—control point

0.169

0.021

7.881***

0.260